PROJECT REPORT FORMAT

               

Some Guidelines for  ECE students for Major Project for Final report

                     All students should submit the Major Project Final report in the following specified format.

                     The TITLE PAGE  and the all HEADINGS specified below.

                     The students may be asked questions on their project. So come prepared for the viva.

                     The text should be typed in 12 font size Times New Roman style in 1.5 spacing on one side of A4 size page.

                     Before typing anything, first set the page size to A4 in Microsoft word, otherwise you may not get the             desired printed output on A4 paper.

 Text :

The text should be typed in 12 font size Times New Roman style in 1.5 spacing on one side of A4 size page (Executive Bond) only.

The Captions for figures should be typed at the its bottomfor example 4th figure in Chapter 3 should be captioned as Fig. 3.4 Title of Figure. For Example

 
 

This is a figure

 

 

 

 

 

 

 

 

Fig. 3.4 Title of Figure

The captions for tables should be typed at its top for example 7th table in Chapter 3 should be captioned as Table. 3.7 Title of Table. For Example

Table 3.7 Title of Table

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 General Guidelines

                      Text should be printed on front and correct side of the watermark on quality bond paper

                      Paper size- A4, 75 to 85 gsm paper

                      Left Margin-1.25”

                      Right Margin-1”

                      Top Margin-1”

                      Bottom Margin-1”

                     The Report shall be hard bound with cover page in z-black colour & written in golden colour.

                     The Project work Report should be typed using following format. Fonts: New Times Roman , Font Size : 12

                     The Format of the Project Report Follows from next page 

                                                            A REPORT  ON MAJOR PROJECT

                                                             TITLE OF PROJECT (24pt)

 

SUBMITTED IN PARTIAL FULFILLMENT FOR AWARD OF DEGREE OF (12pt)

BACHELOR OF TECHNOLOGY(14pt)

IN

ELECTRONICS AND COMMUNICATION ENGINEERING(12pt)

 

BY

NAME OF STUDENTS( UNIV ROLL NO.) (12pt)

 

 

UNDER THE GUIDANCE OF

Sh./Smt. /Dr.  XYZ  ( Assist/ Assoc. Prof, ECE)

 

 

 

 DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING

GLOBAL INSTITUTES OF MANAGEMENT AND EMERGING TECHNOLOGY, AMRITSAR

JAN-APR 2016

 

                                                                              next page>

CANDIDATE'S DECLARATION CERTICICATE

 

We hereby certify that the work which is being presented in the Project entitled “TITLE ___________” by “NAME OF THE STUDENTs” in partial fulfillment of requirements for the award of degree of B.Tech. (ECE) submitted to Department of Electronics and Communication Engineering at Global Institute Of Management and Emerging Technology, Amritsar under PUNJAB TECHNICAL UNIVERSITY, JALANDHAR is our own work carried out during a period from august to december, 2013 under the supervision of NAME OF GUIDE. The matter presented in this thesis has not been submitted by us in any other University / Institute for the award of B.Tech. Degree.

 

Signature of the Students

 

(Name of  Student-1, Univ. Roll No.)

 

 (Name of  Student-2, Univ. Roll No.)

 

 

This is to certify that the above statement made by the candidates is correct to the best of my knowledge.

 

Signature of the Project Guide

Name :

Designation:

 

                                                                               next page>

ABSTRACT

 

                                                                              next page>

ACKNOWLEDGEMENT

 

 

                                                                             next page>

TABLE OF CONTENTS

 

 

CONTENTS

PAGE NO.

 

 

CERTIFICATE

i

 

ABSTRACT

ii

 

ACKNOWLEDGEMENT

iii

 

LIST OF TABLES

iv

 

LIST OF FIGURES

v

 

LIST OF SYMBOLS, ABBREVIATIONS

vi

CHAPTER

 

 

I

 

INTRODUCTION

1-10

 

1.1

Introduction

1

 

1.2

Necessity

3

 

1.3

Objectives

4

 

1.4

Theme

6

 

1.5

Organization

10

II

 

SYSTEM MODEL AND LITERATURE SURVEY

11-20

 

2.1

Introduction

11

 

2.2

Block Diagram

12

 

 

2.2.1 Description of various Blocks

13

 

2.3

Literature Survey

15

III

 

HARDWARE DESCRIPTION

21-30

 

3.1

Introduction

21

 

3.2

Circuit Diagram

22

 

 

3.2.1 List of Components

23

 

 

3.2.2 Description of Components

24

IV

 

IMPLEMENTATION AND DEBUGGING

31-40

 

4.1

Introduction

31

 

4.2

Hardware  Development

32

 

 

4.2.1 PCB Designing

33

 

 

4.2.2 Soldering of Components

34

 

4.3

Software Development and Implementation

35

 

 

4.3.1 Main Program  Flow-Chart

36

 

 

4.3.2 Subroutine Development

37

 

4.4

Interfacing of Hardware

38

 

4.5

Debugging and Testing of  Hardware and Software

39

 

4.6 

Final Words on  Working of Project and Picture of Developed System

40

V

 

CONCLUSIONS AND FUTURE SCOPE

41-43

 

5.1

Conclusions

41

 

5.2

Future Scope

42

 

5.3

Applications

43

 

 

REFERENCES

44

 

 

APPENDICES

45-60

 

 

 

 

 

 

 

LIST OF TABLES

 

 

LIST OF FIGURES

 

 

LIST OF SYMBOLS, ABBREVIATIONS
CHAPTER- I

 

INTRODUCTION

1.1  Introduction

 

1.2  Necessity

 

1.3  Objectives

 

1.4  Theme

 

1.5 Organization

 


CHAPTER- II

 

SYSTEM MODEL AND LITERATURE SURVEY

 

2.1 Introduction

 

2.2 Block Diagram

            2.2.1 Description of various Blocks

 

2.3 Literature Survey

Literature Survey Related information available in standard Books, Journals, Transactions, Internet Websites etc. till date (More emphasis on last three to five years)

 

 


CHAPTER- III

 

HARDWARE DESCRIPTION

3.1 Introduction

 

3.2 Circuit Diagram

            3.2.1 List of Components

            3.2.2 Description of Components

 


CHAPTER- IV

 

IMPLEMENTATION AND DEBUGGING

4.1 Introduction

 

4.2 Hardware  Development

            4.2.1 PCB Designing

            4.2.2 Soldering of Components

 

4.3 Software Development and Implementation

            4.3.1 Main Program  Flow-Chart

            4.3.2 Subroutine Development

 

4.4 Interfacing of Hardware

 

4.5 Debugging and Testing of  Hardware and Software

 

4.6  Final Words on  Working of Project and Picture of Developed System

 


CHAPTER- V

 

CONCLUSIONS AND FUTURE SCOPE

5.1 Conclusions

 

5.2 Future Scope

 

5.3 Applications

 


REFERENCES

 


APPENDICES

 

  • Code/program, etc.
  • Related datasheets or specifications or referred charts.

 

                    

© 2012 Shamsher777.n.nu. All Rights Reserved.

This website was built using N.nu - try it yourself for free.(info & kontakt)
UA-39380082-1